ohr
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

  • home
  • about
  • services
  • portfolio
  • ohr notes
  • articles
  • social media
  • careers
  • contact
  • More
    • home
    • about
    • services
    • portfolio
    • ohr notes
    • articles
    • social media
    • careers
    • contact
ohr

Signed in as:

filler@godaddy.com

  • home
  • about
  • services
  • portfolio
  • ohr notes
  • articles
  • social media
  • careers
  • contact

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

industrial

  Artist's impressions courtesy of the respective project architects unless noted otherwise.

Natural Wellness

  A factory manufacturing wellness products located in one of PetalingJaya’s early industrial areas. The approximately 7566m2 site houses a 5-storey administration block and a 6-storey production block with a common 2-storey basement and a link structure housing common spaces and heavy landscaping, giving a total buildup area of approximately 22,000m2. The structural engineering challenge on this project is to accommodate heavy industrial and landscape loads for large spans and long cantilevers, whilst keeping element sizes to a minimum and, enabling the desired aesthetic and spatial layout.


Location Petaling Jaya

Client Confidential

Architect Hijjas Kasturi

Services Civil, geotechnical and structural

Size/ Cost Approx. 235,000 sqft

Status Design

Year 2019 to date

Signature Market Headquarters Design Competition

  An invited design competition for Signature Market’s headquarters and new factory. Our entry was called Signature Park, emphasising biophilic design where employees could experience various aspects of nature whilst they worked. In line with this theme, a structural timber hybrid option was tabled in addition to the conventional reinforced concrete structure.

  

Location Selangor

Client Signature market

Architect Formzero + MOA

Services Civil, geotechnical and structural

Status Completed

Year 2021 

Rawang Workshop

Refurbishment of an existing reinforced concrete industrial warehouse to include an accessible green roof and mezzanine floor. A new steel frame was introduced to keep the refurbishment works independent of the existing structure. The roof is formed from profile metal deck without the usual concrete topping (when a roof is accessible) and laid upside down to enable the green roof system to be directly supported on it. This saved cost by not requiring the concrete and reinforcement that would have been needed for the topping; and reducing the load carried by the steel frame and foundation.


Location Rawang, Selangor

Client Private owner 

Architect ZLG Design

Services Structural

Status Construction 

Year 2015 to date

TNB Kapar Power Plant

  Four existing cooling water pumps in TNB KaparPower Station were being replaced with heavier new pumps. We undertook a structural desktop assessment for this increase in load to determine if the existing structure had to be strengthened. By back analysing the structure using finite element modelling, we were able to conclude that there were redundancy in the existing structure to accommodate the load increase, negating the need for strengthening.


Location Kapar, Selangor

Client Instrutech 

Services Forensic and remedial: Assessment and design for change of use

Status Scope completed

Year 2015 

portfolio

Ohr Engineering (M) Sdn Bhd I 202301038073 (1531995-D) 

© ohr 2015 - 2024

  • home
  • about
  • services
  • portfolio
  • ohr notes
  • articles
  • social media
  • careers
  • contact

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept