Artist's impressions courtesy of the respective project architects unless noted otherwise
There were quite a few structural challenges posed by this helical sculpture that rotates on plan and on elevation: Simplifying the structural frame to make it buildable whilst keeping the thickness minimal, keeping the load transferred to the existing slab (slab over basement) the garden was located on within the slab’s capacity and ensuring that the design intent and geometry were presented in the drawings in manner that could be easily understood and built.
Location Kuala Lumpur
Client/ Landscape Architect Inchscape
Services Structural. Inception to construction documentation
Status Scope completed
Year 2019
This temporary pavilion called Tree of Tales was commissioned as part of Petronas’s 45th-anniversary celebration. Constructed from modular demountable Fibre Reinforced Polymer cubes designed to sustain its own weight without any additional supports, likely first of its kind to be done in Malaysia, was designed, fabricated, tested and constructed in 8 weeks.
Location Suria KLCC concourse
Client Memories Entertainment/ Petronas
Architect Formzero - MOA
Services Structural
Status Completed
Year 2019
Our entry was for a modular construction that can be demounted. The superstructure was intended to be reused, not requiring any disposal. The structure was designed for use at the expo for 1 year and relocated to Malaysia as a permanent structure or used as single storey pods in the middle east or Malaysia, possibly as emergency or humanitarian structures.
Architect Eleena Jamil
Services Structural
Status Completed
Year 2019
A twisted pentagonal skeletal structure in the shape of MTC's logo. Constructed using glue-laminated timber formed from a local species called Mengkulang.
Fabricator MyGLam
Services Structural: Timber engineering
Client Malaysian TImber Council
Status Completed
Year 2015